利记·sbobet官网

×

News

Waste Incineration Power Generation Project in Tongren was signed
 Date:2016-07-12  From:利记·sbobet官网

On 30 May 2016, “The Cooperation Agreement about Municipal Waste Incineration Power Generation and Joint Disposal Project in Tongren” was officially signed between the government in Tongren and Conch Venture. The capacity of this project was designed to be 600t/d. The project is meaningful to the local environment.